ࡱ> GIBCDEF_ Bbjbjzyzy O6b6bP9jjjjj4h Nhj6*6*p***+*12ggggggg$inlXgQj3++33gjj**4h9993j*j*g93g99]Me*pGm4}c"}gh0Nhcm|5mDMemjee33933333ggT7>333Nh3333m333333333B 0: SECTION 26 08 13 electrical systems prefunctional checklists and start-ups GENERAL RELATED DOCUMENTS Drawings and general provisions of the Contract, including General Conditions and Division 01 Specification Sections, apply to this Section. Specifications throughout all Divisions of the Project Manual are directly applicable to this Section, and this Section is directly applicable to them. SUMMARY This Section expands on and defines responsibilities of the Contractor regarding Prefunctional Checklists and start-up portions of the Commissioning process and addresses validation of proper and thorough installation of mechanical, plumbing and fire protection systems. Contractor shall oversee the Commissioning activities with the Contractors Subcontractors and the Architect/Engineer (A/E). Contractor shall completely install, thoroughly inspect, start-up, test, adjust and integrate Electrical Testing Agency (ETA) on systems and equipment. All activities shall be documented on specific, procedural forms developed for that purpose. Contractor shall notify A/E and Owner in writing that systems are complete and ready for verification and Functional Performance Tests. Completed Prefunctional Checklists for all pieces of equipment shall be submitted to the Owner prior to Functional Performance testing. Responsibilities of the various parties involved in the Commissioning process are defined in Section 26 08 00. Refer to Attachments A and B at the end of this Section for example forms that indicate level of documentation required for the Commissioning process. REFERENCE STANDARDS The latest published edition of a reference shall be applicable to this Project unless identified by a specific edition date. All reference amendments adopted prior to the effective date of this Contract shall be applicable to this Project. All materials, installation and workmanship shall comply with all applicable requirements and standards. SUBMITTALS Prefunctional Checklists, Prefunctional Tests, and Start-up documents are the normal procedure of ensuring that the mechanical, plumbing, and fire protection system components are properly installed. The Subcontractor in cooperation with the A/E and Contractor shall develop Prefunctional Checklists and Prefunctional Tests during the Construction Phase. Completeness of Prefunctional Checklists: This Section summarizes the minimum standard for systems and equipment checkout. A record of testing and acknowledgement that a procedure has been completed and that it checks out acceptably must be included in the Prefunctional Checklists. The Prefunctional Checklist shall identify in columnar format each device, location, test method, control sequence of operation reference, device code reported, and other data as appropriate. Equipment Data Documentation: Provide completed, as-installed, specific product nameplate data, product numbers, serial numbers, etc. to fully define the asset for Owners use in maintenance management and asset tracking. This data may be incorporated within the Equipment Matrix as described in Division 01 as a spreadsheet format or electronic database. In addition to specific manufacturers name and specific product identifiers such as model number, serial numbers, date of manufacture, etc, the following information shall be included with the equipment data documentation: Capacity data: Where applicable, use equipment schedules on the Drawings as a guideline for fields to be used. Location identifier field for each of the three dimensions (Floor Level, X axis, and Y axis) using the Drawing column grids as the basis for location. Submit the equipment data documentation with the draft Prefunctional Checklists to the Owner for approval. A/E and Owner will review the Prefunctional Checklists and request any additional information required to meet the Commissioning Plan criteria. Written Certification: The Contractor shall certify that the installation, Start-up, Prefunctional Checklist, and initial operation of the system or component is in accordance with the Contract Documents, Commissioning Plan, and manufacturers requirements, and that the system is ready for Functional Performance Tests. Any outstanding items or non-conformance shall be clearly indicated and highlighted on the Prefunctional Checklist and an action item shall have been initiated. Refer to Division 01 for specific details on non-conformance issues relating to Prefunctional Checklists. Refer to Section 26 08 00 for additional documentation requirements. PRODUCTS GENERAL All materials shall meet or exceed all applicable referenced standards, federal, state and local requirements, and conform to codes and ordinances of authorities having jurisdiction. The Prefunctional Checklist procedures described in this Section provide minimum guidelines for development of Prefunctional Checklists; Start-up procedures, and Prefunctional Tests. Contractor shall prepare the Prefunctional Checklists using these procedures and that of the manufacturer and/or applicable codes and standards. The Prefunctional Checklist form shall acknowledge that installation and Start-up procedures were successfully adhered to and completely performed and shall document relevant parameters (panel and equipment connections, measured values, ground faults, trip settings, etc.). When indicated as performing a checkout on multiple items or multiple procedure items, Prefunctional Checklist forms shall itemize each individual item. TEST EQUIPMENT Refer to Section 26 08 00 Electrical Systems Commissioning. EXECUTION PREFUNCTIONAL CHECKLIST PROCEDURES [Edit the following as appropriate for the Project:] Thermographic Scanning: Contractor shall provide thermographic scanning on all switchgear and distribution boards. In general, the thermographic scanning shall be made when the equipment is energized and is operating at its normal capacity. It is intended that the scan be made after the equipment has been in full operation; however, the Contractor near the completion of the Project will determine the exact time of conducting the scan. Some scanning for occupant-created load shall be performed during the Warranty Period as a Deferred Test. Test equipment, miscellaneous tools, and materials shall be transported properly, moved, and set up by trained personnel. Equipment used in testing shall be capable of performing all recommended procedures required by the apparatus and related equipment. All test equipment shall have certification of calibration and be in working order. All hot spots shall be marked, identified, and an infrared thermographic scanning report prepared and furnished to the Owner. The report shall contain infrared photos of trouble spots with temperature readings. The Contractor shall promptly report all sources of heating problems to the Owner for corrective action. Grounding Systems: Perform three-point fall-of-potential test per Institute of Electrical and Electronics Engineers (IEEE) Standard 81 on the main grounding electrode or system. Resistance shall be no greater than 5 ohms. Perform the two-point method test per IEEE Standard 81 to determine the ground resistance between the main ground system and all major electrical equipment frames, system neutral, and/or derived neutral points. Resistance shall be no greater than 5 ohms. AC Motors General Across Systems: Verify proper alignment, installation, and rotation. Measure the insulation resistance, phase balance, and resistance to ground. This measurement will generally be the responsibility of the electrical Subcontractor who is connecting the motor. Correction of any deficiencies will be the responsibility of the motor supplier. Where the electrical Subcontractor wires to a single point of a packaged device that is shipped with multiple motors, electrical Subcontractor shall check all motors in the package. Verify that properly sized overloads are in place. Measure voltage available to all phases at time of initial connection and again after motor has been placed in operation under load measure amps and RPM. Record all motor nameplate data. High Voltage Primary Service Feeders: Start-up checklists: Perform the following final checks before Start-up: Inspect underground duct banks. Inspect cable and perform field testing on reels. Inspect splicing and terminations. Starting Procedures: Follow the manufacturer's written procedures and the following as a minimum: Visually and mechanically inspect to include the following: Exposed cable, compression type terminations, splices where approved by the Engineer and the Owner, and fire proofing in manholes, cable vaults, etc. Correct color code identification and phasing arrangements. Perform shield continuity test. Perform insulation resistance test on new and existing cables. Perform high potential test on new cables only. High Voltage Primary Disconnect and Grounding Switches: General: Provide the services of a factorytrained manufacturers representative to assist the Contractor in the installation and startup service of the equipment and to train Owner's personnel as specified. Start-up checklists: Perform the following final checks before Start-up: Inspect incoming power cable terminations. Inspect transformer connections. Inspect grounding. Inspect electrical interlock wiring. Starting Procedures: Follow the manufacturer's written procedures and the following as a minimum: Visually and mechanically inspect to include the following: anchoring, grounding, oil level, torque of bus and cable connections, and mechanical operation of switch and operating mechanisms. Perform contact resistance test. Conduct and review oil sample tests. Perform insulation resistance tests on switch and control wiring. Perform electrical and mechanical (key) interlock system operations. High Voltage Transformer: Provide the services of a factorytrained manufacturers representative to assist the Contractor in the installation and startup service of the equipment and to train Owner's personnel as specified. Start-up checklists: Perform the following final checks before Start-up: Inspect primary and secondary power connections. Inspect control interconnections. Inspect grounding. Starting Procedures: Follow the manufacturer's written procedures and the following as a minimum: Visually and mechanically inspect to include the following: vibration isolation, anchoring, grounding, installation verification using manufacturers checklist, flexible bus connections, torque of bus and cable connections, and tap changer operation. Verify operation of temperature controls/alarms. Perform winding insulation tests. Conduct turns ratio test. Perform power factor/dissipation test on windings and bushings. Perform high voltage and low voltage winding and core resistance measurements. Check and confirm percentage of impedance is identical for all three transformers comparing nameplates. 600V Network Protectors/480V Secondary Distribution: Provide the services of a factorytrained manufacturers representative to assist the Contractor in the installation and startup service of the equipment and to train Owner's personnel as specified. Start-up checklists: Perform the following final checks before Start-up: Inspect transformer connections. Inspect 600V disconnect connections. Inspect grounding. Validate protector element installation (furnished loose). Verify control interconnections. Check calibration/setting of protective devices from system coordination study. Verify calibration/setting of digital metering. Starting Procedures: Follow the manufacturer's written procedures and the following as a minimum: Visually and mechanically inspect to include the following: anchoring, grounding, torque of bus/cable connections, operational check of drawout mechanism, manual/electrical trip/close operations, contact closure using slow closing method, arc chute inspection, and installation verification using manufacturer's checklist. Correct current transformer ratios. Conduct contact resistance test. Perform operational/functional tests of protective relaying. Perform operational/functional tests of digital metering. Perform electrical and mechanical (key) interlock system operational tests. Conduct operational voltage testing with line voltage from transformer only and/or source feeder breaker open. 600V Disconnect Switches/480V Secondary Distribution: Provide the services of a factorytrained manufacturers representative to assist the Contractor in the installation and Start-up service of the equipment and to train Owner's personnel as specified. Start-up checklists: Perform the following final checks before Start-up: Inspect protector and busduct connections. Inspect grounding. Verify control interconnections. Check installation of warning nameplates. Starting Procedures: Follow the manufacturer's written procedures and the following as a minimum: Visually and mechanically inspect to include the following: anchoring, grounding, torque of bus/cable connections, and mechanical operation of switch and operating mechanisms. Conduct insulation resistance tests on switch and control wiring. Conduct contact resistance test. 600V Service Switchgear/480V Secondary Distribution: Provide the services of a factorytrained manufacturers representative to assist the Contractor in the installation and Start-up service of the equipment for a period of three (3) working days in three (3) visits and to train Owner's personnel as specified. Start-up checklists: Perform the following final checks before Start-up: Inspect connections to main breakers. Inspect grounding. Inspect feeder connections to busways and cables. Inspect installation of main, tie and feeder breaker elements. Inspect control and alarm interconnections. Check calibration/setting of trip devices using system coordination study. Verify calibration/setting of digital metering. Starting Procedures: Follow the manufacturer's written procedures and the following as a minimum: Visually and mechanically inspect to include the following: anchoring, grounding, torque of feeder and incoming bus duct connections, feeder cable and integral main bus connections, switchgear section alignments, electrical clearances, mechanical operation of breaker/fuse drawout elements and operating mechanisms, manual trip function, main bus safety shutters, and installation verification using manufacturer's checklist. Check current and potential instrument transformer ratios. Conduct insulation resistance and over potential tests on each type of each breaker element contacts, switchgear control wiring, breaker element control wiring and each bus section. Conduct resistance test through switchgear bus joints. Conduct current test using primary or secondary current injection. Conduct phasing test on triple-ended switchgear. Conduct contact resistance test on each type breaker element. Conduct ground resistance test. Conduct operational/functional tests of protective relaying. Time-current tests shall be conducted and trip points shall be set per Architect/Engineers direction. Conduct operational/functional tests of digital metering. Perform electrical and mechanical (key) interlock system operational tests on generator and service switchgear. 600V Feeder and Subfeeders/480V Secondary Distribution: Start-up checklists: Perform the following final checks before Start-up: Inspect cable terminations. Starting Procedures: Follow the manufacturer's written procedures and the following as a minimum: Visually and mechanically inspect to include the following: large junction and pull boxes, supports of raceways and cable bus, and compression type terminations. Correct identification and phasing arrangements. Conduct continuity test of each feeder. Conduct insulation resistance test of each feeder. 600V Motor Control Centers / 480V Secondary Distribution (16400: Start-up checklists: Perform the following final checks before Start-up: Inspect cable terminations. Check installation and setting of overload relays. Inspect control interconnections. Starting Procedures: Follow the manufacturer's written procedures and the following as a minimum: Visually and mechanically inspect to include the following: anchoring, grounding, torque of feeder and incoming connections, electrical clearances, starter and feeder unit drawout mechanisms, and check installation using manufacturer's checklist. Perform test of overload relays for each size starter using primary current injection methods. Conduct operational tests of starters through local/remote controls. Conduct insulation resistance test on MCC busing, each type motor starter unit (except for variable frequency drives), and each control circuit. Conduct contact resistance and insulation resistance test of molded case main and feeder circuit breakers. Distribution Transformers/480V Secondary Distribution: Start-up checklists: Perform the following final checks before Start-up: Inspect wiring connections. Insure taps are adjusted. Inspect grounding. Starting Procedures: Follow the manufacturer's written procedures and the following as a minimum: Visually and mechanically inspect to include the following: mounting, grounding, electrical clearances, and K factor and/or isolating transformers are installed where required. Perform insulation resistance, turns ratios, and polarity tests on each type /size of transformer. Distribution and Branch Circuit Panelboards/480V Secondary Distribution: Start-up checklists: Perform the following final checks before Start-up: Inspect wiring connections. Starting Procedures: Follow the manufacturer's written procedures and the following as a minimum: Visually and mechanically inspect to include the following: mounting, separate ground and neutral connections per circuit, completed circuit directories, electrical clearances, KAIC ratings of panelboard and breakers. Correct surge suppression devices installed. Review current readings for each panelboard to ensure loads are balanced. Conduct insulation resistance tests. 600V Branch Circuits/480/208/120V Secondary Distribution: Start-up checklists: Perform the following final checks before Start-up: Inspect wiring connections. Starting Procedures: Follow the manufacturer's written procedures and the following as a minimum: Visually and mechanically inspect to include the following: large junction and pull boxes, supports of raceways, and compression type terminations. Correct identification and phasing arrangements. Perform random continuity test of any branch circuit. Receptacle Polarity Test: Test every receptacle installed or reconnected under this Contract with a receptacle circuit tester. Tester shall test for open ground, reverse polarity, open hot, open neutral, hot and ground reversed, hot or neutral and hot open. Rewire receptacles with faults and retest. Ground-Fault Receptacle Circuit Interrupter Tests: Test each receptacle or branch circuit breaker having ground-fault circuit protection to assure that the ground-fault circuit interrupter will not operate when subjected to a ground-fault current of less than 4 milliamperes and will operate when subjected to a ground-fault current exceeding 6 milliamperes. Perform testing using an instrument specifically designed and manufactured for testing ground-fault circuit interrupters. "TEST" button operation will not be acceptable as a substitute for this test. Replace receptacles that do not shutoff power with 5/1000 of an ampere within 1/40th of a second and retest. Submit test report signed by Test Engineer who performed this test. Lighting Fixtures and Lighting Controls / 277 / 120V Lighting: Provide the services of a factorytrained manufacturers representative to assist the Contractor in the installation and Start-up service of the lighting control system and train Owner's personnel as specified below. Representative will confirm the proper installation and operation of all system components. Start-up checklists: Perform the following final checks before Start-up: Ensure all labeling is affixed and accurate. Verify quantity, type and location of fixtures. Verify type and location of switches. Ensure all terminations are tight. Check sensor placement is adequate for required duty. Ensure adequate access is provided to all panels and that documentation of that panel is provided in it. Ensure all circuits for the loads are energized and ready for testing. Starting Procedures: Follow the manufacturer's written procedures and the following as a minimum: Test, calibrate, and set all digital and analog sensing, and actuating devices. Calibrate each instrumentation device by making a comparison between the graphic display and the reading at the device, using an instrument traceable to the National Bureau of Standards, which shall be at least twice as accurate as the device to be calibrated (e.g., if field device is +/-0.5 percent accurate, test equipment shall be +/-0.25 percent accurate over same range). Record the measured value and displayed value for each device in the Prefunctional Checklist. Check each digital control point by making a comparison between the control command at the control panel and the status of the controlled device. Check each digital input point by making a comparison of the state of the sensing device and the OI display. Record the results for each device in the Building Automation System Start-up checklist. Verify operation of lighting controls (dimming, photo-control, regular switching). Check loads on all breakers to ensure that the breaker is properly sized. Enter all schedules per occupants direction. For Operator Interfaces: Verify all elements on the graphics are functional and properly bound to physical devices and/or virtual points and that hot links or page jumps are functional and logical. Output all specified reports for review and approval. Verify the alarm printing and logging is functional and per requirements. Validate all interfaces with other systems on a point by point basis. Lightning Protection System: Start-up checklists: Perform the following final checks before Start-up: Inspect wiring connections. Starting Procedures: Follow the manufacturer's written procedures and the following as a minimum: Visually and mechanically inspect to include the following: air terminal mountings, bonding connections of roof mounted HVAC equipment, down leads routing/roof penetrations, and grounding. Review UL test certification. Check for receipt of UL master label. Fire Alarm Equipment / Fire Alarm and Detection System: Provide the services of a qualified fire alarm specialist to supervise the installation, make adjustments, and perform tests on the fire alarm system and to train Owner's personnel. Start-up checklists: Perform the following final checks before Start-up. Ensure all labeling is affixed and accurate. Ensure all terminations are tight. Ensure adequate access is provided to all panels and that documentation of that panel is provided in the panel. Review that all fire alarm devices as shown on the construction Drawings and Shop Drawings are installed. Review height and locations of pull stations and visual alarms to comply with ADA. Review that smoke and duct detectors are installed according to NFPA 90A. Check that fire alarm system control panel is clear with no trouble or ground faults. Sprinkler flow and tamper switches have been adjusted. Check wire supervision on all devices. Starting Procedures: Follow the manufacturer's written procedures and the following as a minimum: Check location of all sensors and switches to ensure conformance with requirements. Cause activation of all device, assure alarms are initiated and resulting response is per the requirements. Verify interfaces with all other inter-related systems or equipment including building automation system (BAS), sound systems, security systems, HVAC systems, vertical delivery systems, etc. on a point by point basis for all points Validate all output devices (speakers and strobes) meet the code criteria (96 dBa at 10 feet and 117 candela at peak). Activate high temperature detectors in the elevator machine room. Verify all sequences including elevator shunt off, elevator recall including alternate floors when main floor is in alarm. Activate all sprinkler flow switches. Validate that appropriate zone enunciates and alarms sound. Verify audio aspects of the system function as required. Verify paging messages can be heard throughout the building. For annunciator panels, validate correct graphic and correct identification of all zones. Test the action and interlocks of all override switches as appropriate For Operator Interfaces: Verify all elements on the graphics are functional and properly bound to physical devices and/or virtual points and that hot links or page jumps are functional and logical. Output all specified reports for review and approval. Verify the alarm printing and logging is functional and per requirements. Validate all interfaces with other systems on a point by point basis. Grounding/Building Grounding System: Starting Procedures: Follow the manufacturer's written procedures and the following as a minimum: Conduct fall of potential ground resistance tests per IEEE Standard 81 at each test well and at service equipment. Conduct insulation resistance, short circuit, and ground tests of each motor. Uninterruptible Power Systems (UPS): Provide the services of a manufacturer certified specialist to supervise the installation, make adjustments, and perform tests on the UPS and to train Owner's personnel. Automatic Transfer Switches: Provide the services of a manufacturer certified specialist to supervise the installation, make adjustments, and perform tests on the automatic transfer switches and to train Owner's personnel. Start-up checklists: Perform the following final checks before Start-up: Visually inspect the systems. Ensure the terminations are tight and all ancillary equipment completely installed. Ensure all overloads are in place. Measure contact resistance. Starting Procedures: Follow the manufacturer's written procedures and the following as a minimum: Energize Switch. Check positive interlock between systems. Set/Calibrate Voltage sensing relay, transfer time delays (in both directions), and synchronization relays. Measure insulation resistance and resistance to ground. Check manual bypass operation. Emergency Power Engine Generators and Distribution Systems: Provide the services of a manufacturer certified specialist to supervise the installation, make adjustments, and perform tests on the engine generators and emergency power switchgear and to train Owner's personnel. Start-up checklists: Perform the following final checks before Start-up: Visually inspect the systems. Ensure the terminations are tight on power and control wiring. Verify all ancillary equipment completely installed. Ensure all overloads are in place. Verify that generator is set in place. Verify fuel connections. Verify radiator connections. Verify battery connection. Verify exhaust connections. Verify block or oil heater connection. Check and record engine oil level, radiator water level, and battery electrolyte level. Piping System Tests: Complete system test in accordance with the respective section. Inspect the installation and access/clearance for service and maintenance to ensure it meets the Project and manufacturers requirements. Check lubricating oil for lubricatedtype equipment. Check for proper seismic restraints. Check that safety valves have correct setting; greater than compressor discharge pressure, but not greater than pressure rating of system components. Check that all operating controls are set for initial safe operation. Starting Procedures: Follow the manufacturer's written procedures and the following as a minimum: Test generator at 50, 75, 100, 125 percent load capacity using load banks at 100 percent power factor. Run load test at all loads except 125 percent for 30 minutes recording engine and alternator readings at the start, at 15 minutes and at 30 minutes. 125 percent load to be run for 15 minutes recording readings at the start and end of test. Simulate operation of all generator safeties such as high oil pressure, low oil pressure, high temperature, over speed, etc. Observe function of safeties under actual malfunction situation. Check for excessive vibration and noise. acceptance criteria Acceptance criteria for tests are indicated in the Specification Sections applicable to the systems being tested. Unless indicated otherwise, acceptance criteria will be specified with the individual system, equipment, component, or device. Training Training requirements are specified in Specification Section 01 79 00 - Demonstration and Training. END OF SECTION 26 08 13 EXAMPLE - PREFUNCTIONAL CHECKLIST Switchgear, Panelboards, Motor Control Centers, Transformers Project: _____________________________________ Project #:_____________________ Identification of Equipment or System: _________________________________________ Location of Equipment or System: _______________________________________________ Specification Section: ____________________ Detail/Drawing Number: _______________ Manufacturer / Supplier: ________________________________________________________ This Date: __________________ Inspection Requested for (Date): __________________ P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P% Prefunctional Checklist Number: __________________ Components Included: ____Disconnects ____Fuses ____Meters ____Other __________________________________________________ Associated Prefunctional Checklists: __________________ __________________ General: The above systems and components integral to this equipment are complete and ready for Functional Performance Tests. The Prefunctional Checklist items are complete and have been checked off only by parties having direct knowledge of the event, as indicted below, respective to each responsible contractor. This Prefunctional Checklist is submitted for approval and is subject to the attached list of outstanding items not completed successfully. Submit a Deficiency Form upon completion of any outstanding or deficient items. None of the outstanding items preclude safe and reliable functional tests being performed. ___ Deficiency Form attached. This Prefunctional Checklist does not take the place of the manufacturers recommended checkout and Start-up procedures or report. Contractors assigned responsibility for sections of the Prefunctional Checklist shall be responsible to ensure that their subcontractors complete and check off their Checklist items. Prefunctional Checklist items shall be completed as part of Start-up and initial checkout, preparatory to functional testing. Contractor/Entity Company Abbreviation MD Anderson Staff MD ANDERSON Architect/Engineer A/E General Contractor / Construction ManagerGC Mechanical Contractor MC Electrical Contractor EC Building Automation System Provider BAS Test, Adjust, and Balance FirmTAB Commissioning ConsultantCA  Requested Documentation Submitted: Specified RequirementYesNoDate to be Submitteda)Manufacturers Product Data including Performance Data and Shop Drawings, as approved by Architect/Engineerb)Required Test Reports and/or Certificationsc)Installation and Start-up Manual and Pland)Wiring Diagrams, Control Schematics and Sequencese)Operating and Maintenance Manual Content for Applicable Systemf)Equipment Matrix Equipment Verification: ItemSpecifiedSubmittedInstalledManufacturerModel NumberSerial NumberServiceEquipment Rating (amps)Voltage/Phase Installation Checks: a) Unit and General InstallationYesNoComments1.Permanent labels affixed2.Physical condition acceptable, no visible damage, cabinets in place3.Properly mounted on equipment pad and anchored4.Maintenance access acceptable5.Interior clean and dry6.Meter(s) installed per Contract Documents7.Disconnects installed and labeled8.Disconnects are pad lockable in open position9.Circuit breakers installed and labeled10.Fuses installed11.Conduits installed and connected12.Cable/conduit routing does not obstruct access13.Equipment room properly ventilated, air-conditioned, heated, fire/smoke wall separated, fire/smoke dampered, fire sprinklered, fire alarmed and illuminated (normal, emergency and battery backed-up fixtures)14.Record Drawings updated b) Switchgear (service entrance 1500kVA and above) and Switchboards (service entrance less than 1500 kVA)YesNoComments1.Free standing metal enclosure2.Cobber buses3.Penetration to utility service area and equipment per code c) Distribution Panelboards and other PanelboardsYesNoComments1.Tin plated copper buses2.Each circuit identified and labeled3.Space for additional circuits exist d) Motor Control CentersYesNoComments1.Tin plated copper buses2.Main breakers installed and labeled3.Each circuit identified and labeled e) TransformersYesNoComments1.Dry type installed2.Unit properly labeled and identified f) Electrical and ControlsYesNoComments1.Panel devices labeled and wiring tagged per Contract Documents2.I/O devices labeled and wiring tagged per Contract Documents3.Digital inputs and outputs operational4.All electrical connections tight5.Proper grounding installed for the electrical system, equipment, components, and unit6.Safeties in place and operable7.Sensors, transmitters, gages, etc., installed8.Sensors calibrated (see below)9.Control system interlocks hooked up and functional10.All control devices and wiring complete11.Lightning protection installed12.Surge protection installed g) FinalYesNoComments1.Start-up report completed and attached with this Prefunctional Checklist2.Safeties and safe operating ranges for this equipment have been reviewed and accepted3.System is ready for Functional Performance Test Operational Checks: These checks supplement the manufacturers list. This is not the Functional Performance Test. Operational ChecksYesNoComments1.Associated Prefunctional Checklists are complete and accepted2.Fuses are good3.Resistance check(s) complete with results attached4.Disconnect switch operates smoothly with full contact5.Specified point-to-point checks have been completed and documentation record submitted for this system Sensor and/or Actuator Calibration: All field-installed temperature sensors, pressure sensors, meters, and gages, and all actuators and valves on this piece of equipment shall be calibrated. Sensors installed in the unit at the factory with calibration certification provided are not required to be field calibrated. All test instruments have had a certified calibration within the last 12-months: Y / N Sensor/Actuator Verification Table Sensor or ActuatorCorrect Location (Y/N) (1)Thermometer or Gage ValueBAS Value (2)Instrument Measured Value (3)Pass (Y/N) 1) Thermometer/Gage reading is the reading of the permanently mounted instrument on the equipment. 2) BAS is the Building Automation System. Instrument = testing instrument. 3) All sensors are calibrated within required tolerances ___ YES ___ NO FINAL SIGN-OFF Contractors attest that the above items have been verified and meet the requirements of the Contract Documents except as noted on the attached Deficiency form. General Contractor:Print Name: Signature: Title: Date: Electrical SubcontractorPrint Name: Signature: Title: Date: Other Subcontractor:Print Name: Signature: Title: Date:  Prefunctional Checklist received and reviewed for completeness by MD ANDERSON representatives. Functional Performance Test can proceed. MD ANDERSON:Print Name: Signature: Title: Date: MD ANDERSON:Print Name: Signature: Title: Date:A  EXAMPLE - PREFUNCTIONAL CHECKLIST Emergency Power System Project: _____________________________________ Project #:_____________________ Identification of Equipment or System: _________________________________________ Location of Equipment or System: _______________________________________________ Specification Section: ____________________ Detail/Drawing Number: _______________ Manufacturer / Supplier: ________________________________________________________ This Date: __________________ Inspection Requested for (Date): __________________ P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P%P% Prefunctional Checklist Number: ___________ Components Included: ___ Prime Mover, ___ Generator, ___ Fuel System, ___Cooling System, ___Battery System, ___ Exhaust System, ___ ATS, ___ UPS Associated Prefunctional Checklists: ___Piping, ___ Pump, ___ Exhaust Fan, ___Other________________ General: The above systems and components integral to this equipment are complete and ready for Functional Performance Tests. The Prefunctional Checklist items are complete and have been checked off only by parties having direct knowledge of the event, as indicted below, respective to each responsible contractor. This Prefunctional Checklist is submitted for approval and is subject to the attached list of outstanding items not completed successfully. Submit a Deficiency Form upon completion of any outstanding or deficient items. None of the outstanding items preclude safe and reliable functional tests being performed. ___ Deficiency Form attached. This Prefunctional Checklist does not take the place of the manufacturers recommended checkout and Start-up procedures or report. Contractors assigned responsibility for sections of the Prefunctional Checklist shall be responsible to ensure that their subcontractors complete and check off their Checklist items. Prefunctional Checklist items shall be completed as part of start-up and initial checkout, preparatory to functional testing. Contractor/Entity Company Abbreviation MD Anderson Staff MD ANDERSON Architect/Engineer A/E General Contractor / Construction ManagerGC Mechanical Contractor MC Electrical Contractor EC Building Automation System Provider BAS Test, Adjust, and Balance FirmTAB Commissioning ConsultantCA  Requested Documentation Submitted: Specified RequirementYesNoDate to be Submitteda)Manufacturers Product Data including Performance Data and Shop Drawings, as approved by Architect/Engineerb)Required Test Reports and/or Certificationsc)Installation and Start-up Manual and Pland)Wiring Diagrams, Control Schematics and Sequencese)Operating and Maintenance Manual Content for Applicable Systemf)Equipment Matrix Equipment Verification: ItemSpecifiedSubmittedInstalledManufacturerModel NumberSerial NumberServiceSize/Rating (kW / continuous or standby)Fuel TypeVoltage/Phase Installation Checks: a) Unit and General InstallationYesNoComments1.Permanent labels affixed2.Physical condition acceptable3.Properly mounted with vibration isolators4.Factory alignment appears correct5.Field alignment complete6.Maintenance access acceptable7.Fuel piping and/or prime mover exhaust system are properly supported (independent of prime mover and/or generator)8.Recor Drawings updated9.Equipment clean10.Equipment room properly ventilated, air-conditioned, heated, fire/smoke wall separated, fire/smoke dampered, fire sprinklered, fire alarmed and illuminated (normal, emergency and battery backed-up fixtures) 11.All equipment properly identified and labeled b) Prime MoverYesNoComments1.Unit able to run on diesel fuel or a combination of natural gas and diesel fuel2.Air cleaner and oil filter(s) installed3.Vibration isolators active4.Proper oil type used, with level correct5.Exhaust duct installed with proper insulation and silencer/muffler6.Exhaust system discharges to outside7.Condensables able to be removed from exhaust system and discharged properly8.Combustion and/or ventilation air louvers installed correctly9.Cooling water radiator ducted to inlet louver c) GeneratorYesNoComments1.Bearings lubricated2.Rotor and stator in proper condition3.Voltage regulator installed4.Main breaker installed, rated at full load capacity5.Instrument panel is mounted on unit6.Remote annunciator panel installed7.Generator auxiliary panel (dedicated to generator room equipment/lighting) is installed d) Fuel SystemYesNoComments1.Piping Prefunctional Checklist complete and accepted2.Day tank installed, with electric pump, hand pump, and bypass piping/valves3.Above ground fuel tank installed, with pump(s)4.Monitoring system installed5.MD ANDERSON Environmental reviews complete and accepted e) Battery Charger and BatteriesYesNoComments1.Batteries installed in a nonmetallic rack (wall mounted) adjacent to the prime mover2.Battery electrolyte level is correct3.Automatic trickle battery charger is installed (wall mounted) adjacent to battery bank4.Battery cable connections are tight, terminals are clean f) Automatic Transfer SwitchYesNoComments1.ATS rated for operation at the same output as the emergency generator, capacity is greater than total system transferred load2.Transferred loads identified at panel, agrees with listed loads3.ATS installation is complete g) Electrical and ControlsYesNoComments1.Panel devices labeled and wiring tagged per Contract Documents2.Unit mounted instrument panel includes:AC voltmeterAmmeterV-a selector switchFrequency meterRunning time meterVoltage adjusting rheostatExciter overload protectionWarning lights and alarms3.Batteries provided with electronic sensing device for remote notification of battery conditions4.I/O devices labeled and wiring tagged per Contract Documents5.Digital inputs and outputs operational6.All electrical connections tight7.Proper grounding installed for the electrical system, equipment, components, and unit8.Safeties in place and operable9.Sensors, transmitters, gages, etc., installed10.Sensors calibrated (see below)11.Control system interlocks hooked up and functional12.All control devices and wiring complete13.Lightning protection installed h) FinalYesNoComments1.Start-up report completed and attached with this Prefunctional Checklist2.List of items/systems served by the emergency power system is attached3.Fuel tank(s) full4.Safeties and safe operating ranges for this equipment have been reviewed and accepted5.Sequence of operation adequately indicates all information6.System is ready for Functional Performance Test Operational Checks: These checks supplement the manufacturers list. This is not the Functional Performance Test. Operational ChecksYesNoComments1.Associated Prefunctional Checklists are complete and accepted2.ATS operates correctly3.Resistance check(s) complete with results attached4.Fuel system operates correctly5.Ignition and battery systems operate correctly6.Cooling system operates correctly7.Specified point-to-point checks have been completed and documentation record submitted for this system Sensor and/or Actuator Calibration: All field-installed temperature sensors, pressure sensors, meters, and gages, and all actuators and valves on this piece of equipment shall be calibrated. Sensors installed in the unit at the factory with calibration certification provided are not required to be field calibrated. All test instruments have had a certified calibration within the last 12-months: Y / N Sensor/Actuator Verification TableSensor or ActuatorCorrect Location (Y/N) (1)Thermometer or Gage ValueBAS Value (2)Instrument Measured Value (3)Pass (Y/N) 1. Thermometer/Gage reading is the reading of the permanently mounted instrument on the equipment. 2. BAS is the Building Automation System. Instrument = testing instrument. 3. All sensors are calibrated within required tolerances ___ YES ___ NO FINAL SIGN-OFF Contractors attest that the above items have been verified and meet the requirements of the Contract Documents except as noted on the attached Deficiency form. General Contractor:Print Name: Signature: Title: Date: Electrical SubcontractorPrint Name: Signature: Title: Date: Other Subcontractor:Print Name: Signature: Title: Date:  Prefunctional Checklist received and reviewed for completeness by MD ANDERSON representatives. Functional Performance Test can proceed. MD ANDERSON:Print Name: Signature: Title: Date: MD ANDERSON:Print Name: Signature: Title: Date:    MD ANDERSON Project No. XXXXXX MD ANDERSON PROJECT NAME A/E Name Issue Description A/E Project No. Month 00, 0000 鶹ӳ   Jdem      (   - 0 5 : % +>? nq5Ľرh%5qhi;h,# hn*hyrhxh[)hx>h'75h2[h[ hQv@havh^^,hQv h}@h}h]<hl(DKSe  % +?0n /62gd]]gd]]gd]]gd]]gd]]5NZ !-""""#$$#%&'''(gd]]1gd%5qgd]]gd]]gd]]5KLNX! + 2 7 ? F &"+""""""""""$$%%K&X&&&''''''((D(L())*******^+h+++++,,,,......./G/J/P/U///112222h2ohq:h`Nhh_<h hQvaJ h UaJh2hQvhih UP(N(n(((&))7*W****+,E,f,y,,---.I...p/// 0gd]]gd]]gd]] 0 001111-2|2233+4L4q444405`557,7M777888gd]]gd]]gd]]222233 3 333o3y33333!4)4668888888888 99.969T9W9]9b99999;;;;;;;;R<\<u<}<<<<<?=G===>>(Cj>>>@@AABEBBgd]]gd]]gd]]BBHCCC*DtDDDEEE#FdFFFFGG{HHIIJRJJJJ$$gd%5qgd]]gd]]gd]]:J;JDJQJJJnLoLuLvL}L~LLLLLLLLLNNNNO OOOOO`OhO[P^P;QCQJRKRSSKTLTUU3U4U;UhHH\]^JhhF>h9>*\]^JhhF>h9\]^JhhF>h[.]^JhhF>h9]^Jhh9h9CJ\]h!h9h9CJOJQJ\]h%h9h9CJOJQJ\]^Jh#h9h956CJ\]^Jhh9h9CJ\]^Jh h9h95CJ\]^Jhh9h9CJ\]hh9h95\]hyyyy;z܃ڃǸĘttܘttt'75*]^**]^'<h9\]^JhB*\]^Jphh'<h9\]hh'<h9B*\]^Jphh'<h95B*]^Jphh'<h95\]^Jh h9h95CJ\]^JhhF>h_<\]^JhhF>hHH\]^JhhF>h9\]^Jh#˂̂قy$$7$8$H$Ifa$gd]] $7$8$H$Ifgd]]fkd$$IfTl4F $$ t$6    4 laTقڂ{$$7$8$H$Ifa$gd]] $7$8$H$Ifgd]]ekd$$IfTlF $$ t$6    4 laT !%{$$7$8$H$Ifa$gd]] $7$8$H$Ifgd]]ekd9$$IfTlF $$ t$6    4 laT%&=>B{$$7$8$H$Ifa$gd]] $7$8$H$Ifgd]]ekd$$IfTlF $$ t$6    4 laTBCZ[_{$$7$8$H$Ifa$gd]] $7$8$H$Ifgd]]ekdi$$IfTlF $$ t$6    4 laT[_`˃̃Ѓу)*τЄ9:օKa45YZ̃wwwwwhhDh9]^Jhh'<h95\]^Jhh'<h9\]^Jhhn*hyr^JhhhDh9^JhhhDh9\]^JhhhDh95^Jhh'<h9]^Jhh'<h9\]^Jh'<h9\]hh'<h9B*\]^Jph._`{$$7$8$H$Ifa$gd]] $7$8$H$Ifgd]]ekd$$IfTlF $$ t$6    4 laT{$$7$8$H$Ifa$gd]] $7$8$H$Ifgd]]ekd$$IfTlF $$ t$6    4 laT˃̃Ѓ{$$7$8$H$Ifa$gd]] $7$8$H$Ifgd]]ekd7$$IfTlF $$ t$6    4 laTЃу҃Ӄ )wwww $$Ifa$gd]]$ & F a$gd]]$a$gd]]ekd$$IfTlF $$ t$6    4 laT )*-ZQQEEE $$Ifa$gd]] $Ifgd]]kdg$$IfTl\"$$M t0$644 laythDT̄̈́΄G>>22 $$Ifa$gd]] $Ifgd]]kd $$IfTlre"$$y t0$644 laythDT΄τЄӄ;22 $Ifgd]]kd$$IfTlre"$$y t0$644 laythDT $$Ifa$gd]]6;22 $Ifgd]]kdl$$IfTlre"$$y t0$644 laythDT $$Ifa$gd]]6789:=;2 $Ifgd]]kd$$IfTlre"$$y t0$644 laythDT $$Ifa$gd]]=|}~2kd$$IfTlre"$$y t0$644 laythDT $$Ifa$gd]] $Ifgd]] $$Ifa$gd]] $Ifgd]]G??0?$ & F a$gd]]$a$gd]]kd $$IfTlre"$$y t0$644 laythDT…̅օׅTHHH $$Ifa$gd]]kd0 $$IfTl\ !$$ ~  t0$4 laT $$Ifa$gd]]Tkd $$IfTl\ !$$ ~  t0$4 laT $$Ifa$gd]] `TTTT $$Ifa$gd]]kd $$IfTl\ !$$ ~  t0$4 laT `TTTT $$Ifa$gd]]kd( $$IfTl\ !$$ ~  t0$4 laT/012`TTTT $$Ifa$gd]]kd $$IfTl\ !$$ ~  t0$4 laT23ABCD`WWWW $Ifgd]]kdx $$IfTl\ !$$ ~  t0$4 laTDEFGHI`WWWW $Ifgd]]kd $$IfTl\ !$$ ~  t0$4 laTIJK`a`[LD88 $$Ifa$gd]]$a$gd]]$ & F a$gd]]gd]]kd$$IfTl\ !$$ ~  t0$4 laTNBBB $$Ifa$gd]]kdp$$IfTl4\$$*f t0$44 laythDT $$Ifa$gd]]<0 $$Ifa$gd]]kd$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]1<0 $$Ifa$gd]]kd$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]123458<0 $$Ifa$gd]]kdo$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]8VWXYZ<kd$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]Z]tuvw $$Ifa$gd]] $$Ifa$gd]]Zwxч҇45LMuv!"FGZ[23]^cdfًڋ -.GHstyzȼȯ鯼鯼鯼h'<h9\]^JhhhDh95^Jhh'<h9]^Jh hrz#^JhhhDh9CJ]^JhhhDh9]^JhhhDh9^JhEwx{H<000 $$Ifa$gd]] $$Ifa$gd]]kd$$IfTlr$$*f t0$44 laythDT·χ<0 $$Ifa$gd]]kdy$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]χЇч҇Շ<0 $$Ifa$gd]]kd'$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]] <0 $$Ifa$gd]]kd$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]] 12345<kd$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]59IJKL $$Ifa$gd]] $$Ifa$gd]]LMQrstH<000 $$Ifa$gd]] $$Ifa$gd]]kd1$$IfTlr$$*f t0$44 laythDTtuvz<0 $$Ifa$gd]]kd$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]<0 $$Ifa$gd]]kd$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]<0 $$Ifa$gd]]kd;$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]<kd$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]!"%Fkd$$IfTl4\$$*f t0$44 laythDT $$Ifa$gd]]$a$gd]]%CDEFG<kd:$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]GJWXYZ $$Ifa$gd]] $$Ifa$gd]]Z[^H<000 $$Ifa$gd]] $$Ifa$gd]]kd$$IfTlr$$*f t0$44 laythDT<0 $$Ifa$gd]]kd$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]<4$a$gd]]kdD$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]؊܊ߊBkd$$IfTl4\$$*f t0$44 laythDT $$Ifa$gd]] $Z^Za$gd]]<kd$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]] /012 $$Ifa$gd]] $$Ifa$gd]]236Z[\H<000 $$Ifa$gd]] $$Ifa$gd]]kdC$$IfTlr$$*f t0$44 laythDT\]^_`a<0 $$Ifa$gd]]kd$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]abcdef<00 $Z^Za$gd]]kd$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]fNB $$Ifa$gd]]kdM $$IfTl4\$$*f t0$44 laythDT $$Ifa$gd]]<0 $$Ifa$gd]]kd $$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]֋׋؋ًڋ<kd!$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]ڋ݋ $$Ifa$gd]] $$Ifa$gd]] H<000 $$Ifa$gd]] $$Ifa$gd]]kdL"$$IfTlr$$*f t0$44 laythDT <44$a$gd]]kd"$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]] !$-.1DNB $$Ifa$gd]]kd#$$IfTl4\$$*f t0$44 laythDT $$Ifa$gd]]DEFGHK<0 $$Ifa$gd]]kdK$$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]Kpqrst<kd$$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]tuvwxy $$Ifa$gd]] $$Ifa$gd]]yz{|}~H<000 $$Ifa$gd]] $$Ifa$gd]]kd%$$IfTlr$$*f t0$44 laythDT~<44$a$gd]]kdU&$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]NB $$Ifa$gd]]kd'$$IfTl4\$$*f t0$44 laythDT $$Ifa$gd]]89fgFGlm֎׎ !#<= !&'ÐWX ǓȓG\ϴϩϟh'<h9^Jhh'<h9\]hh'<h95\]^JhhhDh95^Jhh'<h9\]^JhhhDh9CJ]^JhhhDh9^JhhhDh9]^Jh:<0 $$Ifa$gd]]kd'$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]567893kdT($$IfTlr$$*f t0$44 laythDT $$Ifa$gd]] $Ifgd]]9<cdef $$Ifa$gd]] $Ifgd]] $$Ifa$gd]]fgjH<3' $$Ifa$gd]] $Ifgd]] $$Ifa$gd]]kd)$$IfTlr$$*f t0$44 laythDT<0 $$Ifa$gd]]kd)$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]3kd^*$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]] $Ifgd]] $$Ifa$gd]] $$Ifa$gd]]CDEH<000 $$Ifa$gd]] $$Ifa$gd]]kd +$$IfTlr$$*f t0$44 laythDTEFGJij<0 $$Ifa$gd]]kd+$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]jklmp<0 $$Ifa$gd]]kdh,$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]<0 $$Ifa$gd]]kd-$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]ӎԎՎ֎׎<kd-$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]׎ێ $$Ifa$gd]] $$Ifa$gd]]H<000 $$Ifa$gd]] $$Ifa$gd]]kdr.$$IfTlr$$*f t0$44 laythDT !"#<44$a$gd]]kd /$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]#,03<=@NB $$Ifa$gd]]kd/$$IfTl4\$$*f t0$44 laythDT $$Ifa$gd]]<0 $$Ifa$gd]]kdq0$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]<kd1$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]] $$Ifa$gd]] $$Ifa$gd]] !"#$%H<000 $$Ifa$gd]] $$Ifa$gd]]kd1$$IfTlr$$*f t0$44 laythDT%&'(*<4( $h^ha$gd]]$a$gd]]kd{2$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]*>? $$Ifa$gd]]$ & F 8a$gd]]$a$gd]]$ & F a$gd]]ÐƐZNBBBB $$Ifa$gd]] $$Ifa$gd]]kd)3$$IfTl4\$$*f t0$44 laythDT H<000 $$Ifa$gd]] $$Ifa$gd]]kd3$$IfTlr$$*f t0$44 laythDT!TU<0 $$Ifa$gd]]kdz4$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]UVWX[<0 $$Ifa$gd]]kd(5$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]<0 $$Ifa$gd]]kd5$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]<kd6$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]] $$Ifa$gd]] $$Ifa$gd]] /H@4%$ & F a$gd]] $h^ha$gd]]$a$gd]]kd27$$IfTlr$$*f t0$44 laythDT/0JKǓȓۓ<G $$Ifa$gd]]gd]] $^a$gd]]$ & F 8a$gd]]$a$gd]]GHIJKL=1111 $$Ifa$gd]]kd7$$IfTlֈ F$$FT0$4 laTLMNOPQ1kd8$$IfTlֈ F$$FT0$4 laT $$Ifa$gd]]QRSTUV1kd\9$$IfTlֈ F$$FT0$4 laT $$Ifa$gd]]VWXYZ[\ $$Ifa$gd]]\]^_`a=1111 $$Ifa$gd]]kd:$$IfTlֈ F$$FT0$4 laTabcde1)$a$gd]]kd:$$IfTlֈ F$$FT0$4 laT $$Ifa$gd]]eȔ\^mn#/01 $Ifgd]]gd]],$$$d%d&d'd@&NOPQa$gd]]$"^`"a$gd]] $@&^gd]] $^a$gd]]$8^8`a$gd]] \^mn12@AKLUVWXɖʖٖؖ1<yzǗחؗöÓöhhDhM*^JhhM*5\]^JhhhDh9\]^JhhhDh9^Jhh9h9\]^Jhh9h95\]^Jhh9hF \]^Jh!h9h95CJ]^JaJhh9h9CJ\]^Jh6123>?@kbbbb $Ifgd]]kd;$$IfTl4F Z$$`x Z t0$6    44 laythDT@ABIJKkbbbb $Ifgd]]kd3<$$IfTl4F Z$$ x Z t0$6    44 laythDTKLMSTUkbbbb $Ifgd]]kd<$$IfTl4F Z$$ x Z t0$6    44 laythDTUVWkb $Ifgd]]kdm=$$IfTl4F Z$$ x Z t0$6    44 laythDTWXq}~ $Ifgd]]qkd >$$IfTl4p$$h% t0$644 laf4ytXTkbbbb $Ifgd]]kd>$$IfTl4F Z$$`x Z t0$6    44 laythDTkbbbb $Ifgd]]kd*?$$IfTl4F Z$$ x Z t0$6    44 laythDTkbbbb $Ifgd]]kd?$$IfTl4F Z$$ x Z t0$6    44 laythDTkb $Ifgd]]kdd@$$IfTl4F Z$$ x Z t0$6    44 laythDTǖȖɖ $Ifgd]]qkdA$$IfTl4p$$h% t0$644 laf4ytXTɖʖ˖֖זؖkbbbb $Ifgd]]kdA$$IfTl4F Z$$`x Z t0$6    44 laythDTٖؖږkbbbb $Ifgd]]kd!B$$IfTl4F Z$$ x Z t0$6    44 laythDTkbbbb $Ifgd]]kdB$$IfTl4F Z$$ x Z t0$6    44 laythDTyzkfff]]]] $Ifgd]]gd]]kd[C$$IfTl4F Z$$ x Z t0$6    44 laythDTkbbbb $Ifgd]]kdC$$IfTl4F W$$`x Z t0$6    44 laythDTkbbbb $Ifgd]]kdD$$IfTl4F W$$ x Z t0$6    44 laythDTkbbbb $Ifgd]]kd2E$$IfTl4F W$$ x Z t0$6    44 laythDTkb $Ifgd]]kdE$$IfTl4F W$$ x Z t0$6    44 laythDTɗ՗֗ח $Ifgd]]qkdlF$$IfTl4p$$h% t0$644 laf4ytXTחؗٗkbbbb $Ifgd]]kdF$$IfTl4F W$$`x Z t0$6    44 laythDTkbbbb $Ifgd]]kdG$$IfTl4F W$$ x Z t0$6    44 laythDT!789@Ahio٘ژԙޙ$JLƚȚĶ{p{{p`UhDQh[.^JaJhDQh[.56CJ^JaJhLh[.CJ^Jh[.56CJ^Jh4h[.5CJ^Jh[.CJ^Jht,h[.CJ^Jh[.5CJ^Jh[.0J#CJhh[.0J#5CJaJh[.0J#5CJaJhh[.0J#5CJaJh[. h,_^JhhhDh9\]^JhhhDh9^Jhkbbbb $Ifgd]]kd)H$$IfTl4F W$$ x Z t0$6    44 laythDT!89ژkf^^^PPJ*$gd]]`*$^``gd]]$a$gd]]gd]]kdH$$IfTl4F W$$ x Z t0$6    44 laythDTژۘ,-әԙLƚȚ $N$%J$ & F a$gd]]$a$gd]]!gd]]  h!gd]]gd]]P*$^`Pgd]]*$gd]]Ț $]^ܠݠޠ ѹvlbl[Q:l,h7sh[.5B*CJOJQJ^JaJphh'<h[.5^J h'<5^Jh'<h_<\]h'<h[.\]h'<hHHCJOJQJ^Jh'<h[.CJOJQJ^Jh'<h[.^Jh'<h[.\]^Jh[.h[.CJ\]^JaJhDQh[.CJ^JaJh[.5\^JaJhDQh[.5\^JaJh[.0J#5CJ\^JaJ"hDQh[.0J#5CJ\^JaJ!"]^ܠޠ &$$Ifa$gd]]$ & F 81$gd]]$a$gd]]$$^`a$gd]]$$ & F 8a$gd]] $^a$gd]]$ & F 8a$gd]] $h^ha$gd]] * &$$Ifa$gd]] &$Ifgd]]fkdcI$$IfTl4F $$ t$6    4 laT (*+ADFGvwܡݡ!"Hbzԣ'̤`g§ީؼتؼؼؼؼؼؼؼxlxxcxxh7s\]^Jhn*hyr\]^JhhDh[.\]^Jh\h[.5\]^Jh7sh[.5\]^Jh'<h[.\]^J#h'75B*CJOJQJ^JaJphh'<h[.\]#hM*B*CJOJQJ^JaJph)h'<h[.B*CJOJQJ^JaJph#hB*CJOJQJ^JaJph&*+@AF &$$Ifa$gd]] &$Ifgd]]ekdI$$IfTlF $$ t$6    4 laTFGqrv &$$Ifa$gd]] &$Ifgd]]ekdJ$$IfTlF $$ t$6    4 laTvw &$$Ifa$gd]] &$Ifgd]]ekd.K$$IfTlF $$ t$6    4 laT &$$Ifa$gd]] &$Ifgd]]ekdK$$IfTlF $$ t$6    4 laT֡סܡ &$$Ifa$gd]] &$Ifgd]]ekd^L$$IfTlF $$ t$6    4 laTܡݡ &$$Ifa$gd]] &$Ifgd]]ekdL$$IfTlF $$ t$6    4 laT! &$$Ifa$gd]] &$Ifgd]]ekdM$$IfTlF $$ t$6    4 laT!"#$GH^bezwwww $$Ifa$gd]]$ & F a$gd]]$a$gd]]ekd,N$$IfTlF $$ t$6    4 laT z{~ZQQEEE $$Ifa$gd]] $Ifgd]]kdN$$IfTl\"$$M t0$644 laythDTG>>22 $$Ifa$gd]] $Ifgd]]kdmO$$IfTlre"$$y t0$644 laythDT !$NO;22 $Ifgd]]kdP$$IfTlre"$$y t0$644 laythDT $$Ifa$gd]]OPQRU;22 $Ifgd]]kdP$$IfTlre"$$y t0$644 laythDT $$Ifa$gd]];2 $Ifgd]]kdQ$$IfTlre"$$y t0$644 laythDT $$Ifa$gd]]ͣΣϣУѣ2kd1R$$IfTlre"$$y t0$644 laythDT $$Ifa$gd]] $Ifgd]]ѣԣ $$Ifa$gd]] $Ifgd]]G??0?$ & F a$gd]]$a$gd]]kdR$$IfTlre"$$y t0$644 laythDT '(567THHH $$Ifa$gd]]kdS$$IfTl\ !$$ ~  t0$4 laT $$Ifa$gd]]789FGHITkd;T$$IfTl\ !$$ ~  t0$4 laT $$Ifa$gd]]IJXYZ[`TTTT $$Ifa$gd]]kdT$$IfTl\ !$$ ~  t0$4 laT[\defg`TTTT $$Ifa$gd]]kdU$$IfTl\ !$$ ~  t0$4 laTgh`TTTT $$Ifa$gd]]kd3V$$IfTl\ !$$ ~  t0$4 laT`TTTT $$Ifa$gd]]kdV$$IfTl\ !$$ ~  t0$4 laT`WWWW $Ifgd]]kdW$$IfTl\ !$$ ~  t0$4 laTˤ̤`[LD88 $$Ifa$gd]]$a$gd]]$ & F a$gd]]gd]]kd+X$$IfTl\ !$$ ~  t0$4 laTNBBB $$Ifa$gd]]kdX$$IfTl4\$$*f t0$44 laythDT $$Ifa$gd]]"@A<0 $$Ifa$gd]]kdvY$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]ABCDGq<0 $$Ifa$gd]]kd$Z$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]qrstux<0 $$Ifa$gd]]kdZ$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]x<kd[$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]] $$Ifa$gd]] $$Ifa$gd]]ߥH<000 $$Ifa$gd]] $$Ifa$gd]]kd.\$$IfTlr$$*f t0$44 laythDTYZ<0 $$Ifa$gd]]kd\$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]Z[\]`w<0 $$Ifa$gd]]kd]$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]wxyz{~<0 $$Ifa$gd]]kd8^$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]~<kd^$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]fghi $$Ifa$gd]] $$Ifa$gd]]ijnH<000 $$Ifa$gd]] $$Ifa$gd]]kd_$$IfTlr$$*f t0$44 laythDT<44$a$gd]]kdB`$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]§çƧNB $$Ifa$gd]]kd`$$IfTl4\$$*f t0$44 laythDT $$Ifa$gd]]<0 $$Ifa$gd]]kda$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]EFGHI<kdAb$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]ILghij $$Ifa$gd]] $$Ifa$gd]]jknH<000 $$Ifa$gd]] $$Ifa$gd]]kdb$$IfTlr$$*f t0$44 laythDT<0 $$Ifa$gd]]kdc$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]] <0 $$Ifa$gd]]kdKd$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]] <0 $$Ifa$gd]]kdd$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]`abcd<kde$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]dg $$Ifa$gd]] $$Ifa$gd]]ک۩ܩH<000 $$Ifa$gd]] $$Ifa$gd]]kdUf$$IfTlr$$*f t0$44 laythDTܩݩީߩ<4( $Z^Za$gd]]$a$gd]]kdg$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]NB $$Ifa$gd]]kdg$$IfTl4\$$*f t0$44 laythDT $$Ifa$gd]]Z]|hs׬- LPïӯկ&(FHgi<Ͷζ϶gh۹涯ڥڶڛh'<h[.5\]^Jh'<h[.\]h'<h[.5^J h'<h[.h'<h[.0J%\]^JhhDh[.\^JhhDhM*\]^Jh'<h[.\]^JhhDh[.\]^Jh\h[.5\]^J7<0 $$Ifa$gd]]kdTh$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]DEFGH<kdi$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]HKghij $$Ifa$gd]] $$Ifa$gd]]jknH<000 $$Ifa$gd]] $$Ifa$gd]]kdi$$IfTlr$$*f t0$44 laythDTͪΪ<0 $$Ifa$gd]]kd^j$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]ΪϪЪѪԪ<0 $$Ifa$gd]]kd k$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]<0 $$Ifa$gd]]kdk$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]VWXYZ<kdhl$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]Z[]lps| $$Ifa$gd]]!Z^Zgd]] $Z^Za$gd]]|}ZNBBBB $$Ifa$gd]] $$Ifa$gd]]kdm$$IfTl4\$$*f t0$44 laythDT H<000 $$Ifa$gd]] $$Ifa$gd]]kdm$$IfTlr$$*f t0$44 laythDT >?<0 $$Ifa$gd]]kdgn$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]?@ABEa<0 $$Ifa$gd]]kdo$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]abcdeh<0 $$Ifa$gd]]kdo$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]h<7!gd]]kdqp$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]Ǭˬά׬ج۬Ikdq$$IfTl4\$$*f t0$44 laythDT $$Ifa$gd]]!gd]]۬01234<kdq$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]47\]^_ $$Ifa$gd]] $$Ifa$gd]]_`cH<000 $$Ifa$gd]] $$Ifa$gd]]kdpr$$IfTlr$$*f t0$44 laythDT<0 $$Ifa$gd]]kds$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]<77!gd]]kds$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]!$-.1NB $$Ifa$gd]]kdzt$$IfTl4\$$*f t0$44 laythDT $$Ifa$gd]]<0 $$Ifa$gd]]kdu$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]<kdu$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]] $$Ifa$gd]] $$Ifa$gd]] <@CHCC777 $$Ifa$gd]]!gd]]kdyv$$IfTlr$$*f t0$44 laythDTCLMPNBBBB $$Ifa$gd]]kd'w$$IfTl4\$$*f t0$44 laythDT $$Ifa$gd]]H<000 $$Ifa$gd]] $$Ifa$gd]]kdw$$IfTlr$$*f t0$44 laythDT¯ïЯ<0' $Ifgd]] $$Ifa$gd]]kdxx$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]Яѯүӯԯկ<0 $$Ifa$gd]]kd&y$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]կݯޯ߯3kdy$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]] $Ifgd]] $$Ifa$gd]] $Ifgd]] $$Ifa$gd]] H<3' $$Ifa$gd]] $Ifgd]] $$Ifa$gd]]kdz$$IfTlr$$*f t0$44 laythDT <0 $$Ifa$gd]]kd0{$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]#$%&'3kd{$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]] $Ifgd]]'(CDEF $$Ifa$gd]] $Ifgd]] $$Ifa$gd]]FGHdeH<3' $$Ifa$gd]] $Ifgd]] $$Ifa$gd]]kd|$$IfTlr$$*f t0$44 laythDTefghi<0 $$Ifa$gd]]kd:}$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]i3kd}$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]] $Ifgd]] $$Ifa$gd]] $Ifgd]] $$Ifa$gd]]./H<3' $$Ifa$gd]] $Ifgd]] $$Ifa$gd]]kd~$$IfTlr$$*f t0$44 laythDT/0125<0 $$Ifa$gd]]kdD$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]5\]^_`3kd$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]] $Ifgd]]`c $$Ifa$gd]] $Ifgd]] $$Ifa$gd]]H<3' $$Ifa$gd]] $Ifgd]] $$Ifa$gd]]kd$$IfTlr$$*f t0$44 laythDT<0 $$Ifa$gd]]kdN$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]] <0 $$Ifa$gd]]kd$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]<=>?<kd$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]@Dcdef $$Ifa$gd]] $$Ifa$gd]]fgkH<000 $$Ifa$gd]] $$Ifa$gd]]kdX$$IfTlr$$*f t0$44 laythDTβϲ<0 $$Ifa$gd]]kd$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]ϲвѲҲֲ<0 $$Ifa$gd]]kd$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]<77!gd]]kdb$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]] aNB $$Ifa$gd]]kd$$IfTl4\$$*f t0$44 laythDT $$Ifa$gd]]abcdeh<0 $$Ifa$gd]]kd$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]h<kda$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]ȳɳʳ˳ $$Ifa$gd]] $$Ifa$gd]]˳̳ϳ%&'H<000 $$Ifa$gd]] $$Ifa$gd]]kd$$IfTlr$$*f t0$44 laythDT'(),gh<0 $$Ifa$gd]]kd$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]hijkn<0 $$Ifa$gd]]kdk$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]<7!gd]]kd$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]],03< $$Ifa$gd]]$ & F 8a$gd]]$a$gd]]$ & F a$gd]]gd]] <=@~ZNBBBB $$Ifa$gd]] $$Ifa$gd]]kdNJ$$IfTl4\$$*f t0$44 laythDTH<000 $$Ifa$gd]] $$Ifa$gd]]kdj$$IfTlr$$*f t0$44 laythDTֵ׵<0 $$Ifa$gd]]kd$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]׵صٵڵݵ<0 $$Ifa$gd]]kdƌ$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]<0 $$Ifa$gd]]kdt$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]23456<kd"$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]69[\]^ $$Ifa$gd]] $$Ifa$gd]]^_bɶʶ˶H<000 $$Ifa$gd]] $$Ifa$gd]]kdЎ$$IfTlr$$*f t0$44 laythDT˶̶Ͷζ϶<4$$h^h`a$gd]]$a$gd]]kd~$$IfTlr$$*f t0$44 laythDT $$Ifa$gd]]϶ghYbkd,$$IfTl$$$0$4 laT $$Ifa$gd]]gd]] $^a$gd]]$ & F 8a$gd]]$a$gd]]$ & F a$gd]] Ը޸ $$Ifa$gd]] =1111 $$Ifa$gd]]kd$$IfTlֈ F$$FT0$4 laT1kdb$$IfTlֈ F$$FT0$4 laT $$Ifa$gd]]1kd $$IfTlֈ F$$FT0$4 laT $$Ifa$gd]] $$Ifa$gd]] !"#$%=1111 $$Ifa$gd]]kdޒ$$IfTlֈ F$$FT0$4 laT%&'()1("^gd]]kd$$IfTlֈ F$$FT0$4 laT $$Ifa$gd]])۹'(89ٺں $Ifgd]]gd]])$$d%d&d'dNOPQa$gd]]$"^`"a$gd]]^gd]] $^a$gd]] "8^8`gd]] ۹'()89ٺںDEPȼɼʼOVʽ˽̽ͽν@,@.@;@V@^@_@a@b@j@k@Ⱦȃȃ}upulllh%5q h%5q;h%5qh%5q;Uhsd hKnh%5qh*[zjh*[zUhQwh[.^JhhDhM*^J hM*5^JhhDh[.^J h[.^Jhzh[.5^Jh[.h[.^JaJh'<h[.CJ^JaJh'<h[.\]^J$h'<h[.56CJ\]^JaJ( kbbbb $Ifgd]]kdZ$$IfTl4F Z$$`x Z t0$6    44 laythDT kbbbb $Ifgd]]kd$$IfTl4F Z$$ x Z t0$6    44 laythDT kbbbb $Ifgd]]kd$$IfTl4F Z$$ x Z t0$6    44 laythDT !"kb $Ifgd]]kd1$$IfTl4F Z$$ x Z t0$6    44 laythDT"#<HIJ $Ifgd]]lkdΖ$$IfTl$$h% t0$644 laythDTJKLWXYkbbbb $Ifgd]]kdG$$IfTl4F Z$$`x Z t0$6    44 laythDTYZ[bcdkbbbb $Ifgd]]kd$$IfTl4F Z$$ x Z t0$6    44 laythDTdeflmnkbbbb $Ifgd]]kd$$IfTl4F Z$$ x Z t0$6    44 laythDTnopkb $Ifgd]]kd$$IfTl4F Z$$ x Z t0$6    44 laythDTpq $Ifgd]]lkd$$IfTl$$h% t0$644 laythDTkbbbb $Ifgd]]kd4$$IfTl4F Z$$`x Z t0$6    44 laythDTkbbbb $Ifgd]]kdњ$$IfTl4F Z$$ x Z t0$6    44 laythDTkbbbb $Ifgd]]kdn$$IfTl4F Z$$ x Z t0$6    44 laythDTDER^_`kfff]]]] $Ifgd]]gd]]kd $$IfTl4F Z$$ x Z t0$6    44 laythDT`abmnokbbbb $Ifgd]]kd$$IfTl4F W$$`x Z t0$6    44 laythDTopqxyzkbbbb $Ifgd]]kdE$$IfTl4F W$$ x Z t0$6    44 laythDTz{|kbbbb $Ifgd]]kd$$IfTl4F W$$ x Z t0$6    44 laythDTkb $Ifgd]]kd$$IfTl4F W$$ x Z t0$6    44 laythDT $Ifgd]]lkd$$IfTl$$h% t0$644 laythDTkbbbb $Ifgd]]kd$$IfTl4F W$$`x Z t0$6    44 laythDTkbbbb $Ifgd]]kd2$$IfTl4F W$$ x Z t0$6    44 laythDTżƼǼkbbbb $Ifgd]]kdϠ$$IfTl4F W$$ x Z t0$6    44 laythDTǼȼɼ˼̼ͼμϼмѼҼkfdddddd__gdagd]]kdl$$IfTl4F W$$ x Z t0$6    44 laythDT ҼӼԼռּ׼ؼټڼۼܼݼ޼߼gd\gd7sgdygd[.gdF gd9gd++gd0M"gdMgdagd\gd7sgdygd[.gdF gd9gd++gd0M"gdMgda gd\gd7sgdygd[.gdF gd9gd++gd0M"gdMgda !"#$%&'()*+,-./01gd7sgdygd[.gdF gd9gd++gd0M"gdMgda12346789:;<=>?@ABCDEFGHIgd[.gdF gd9gd++gd0M"gdMgdagd\gd7sIJKLMNOPQRSTUVɽʽ˽̽ͽν<@_@@@gd%5qgd%5qgd++gdagd\gd7sgdyelectrical systems prefunctional checklists and start-ups MD Anderson Cancer Center 26 08 13 MS 20190301  PAGE 1 OF  SECTIONPAGES 15 鶹ӳ ATTACHMENT A electrical systems prefunctional CHECKLISTS and start-ups MD Anderson Cancer Center 26 08 13 A MS20190301  PAGE 5 OF  SECTIONPAGES 6 鶹ӳ MD Anderson Cancer Centerattachment B to electrical systems prefunctional checklists and start-ups 26 08 13 B MS20190301 PAGE 7 of  SECTIONPAGES 7 k@l@r@s@t@u@y@z@@@@@@@@@@@@@@@@@@@AA!A"A,A-A.A4A5A6A7A;A^`>CJOJQJ\]h4oQ4 [.Tbl Norm CJOJQJXobX [.Default&1$7$8$H$!B*CJ_HaJmH phsH tH X1X rz# Attachment ID'$ !xa$ 5;CJRR rz#Attachment Name($xa$m$ 5;CJb1b rz#Attachment,Proj Number) h!xx^FF rz#Comment *xx5;B*CJph8/8 rz#ART Char;OJQJ^J4/4 rz#PR2 Char OJQJ^J6/6 %5q0 Header CharOJQJ6/6 %5q0 Footer CharOJQJ4/4 %5qPR3 Char OJQJ^J4R4 %5qSCT 0*$ 5;^JBOB %5q SPEC NOTE1x5B*\phPK![Content_Types].xmlN0EH-J@%ǎǢ|ș$زULTB l,3;rØJB+$G]7O٭Vc:E3v@P~Ds |w< :qNGOO66Pkoooyyy888;52:J`\y=[Z\Ț ۹k@`AB_behlorx0( 08BJsV3`0jry:~ق%B_Ѓ)΄6= 2DI18Zwχ 5Lt%GZ2\afڋ DKty~9fEj׎# %*U/GLQV\ae1@KUWɖؖחژ*Fvܡ!zOѣ7I[gAqxZw~iIj dܩHjΪZ| ?ah۬4_CЯկ 'Fei/5`@fϲah˳'h<׵6^˶϶  %)  "JYdnp`ozǼҼ1I@YAAB`acdfgijkmnpqstuvwyz{|}~      !"#$%&'()*+,-./123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~KRTYik!13;!tB4!tB4!tB@ @H 0(  0(  B S  ?< OLE_LINK1 OLE_LINK2 _Hlk446890 _Hlk446891 _Hlk447214 _Hlk447215 _Hlk447605 _Hlk447606 _Hlk448082 _Hlk448083 _Hlk449066 _Hlk449067 _Hlk449381 _Hlk449382 _Hlk449571 _Hlk449572 _Hlk449859 _Hlk449860 _Hlk450078 _Hlk450079 _Hlk450272 _Hlk450273 _Hlk450793 _Hlk450794 _Hlk451149 _Hlk451150 _Hlk451408 _Hlk451409 _Hlk451576 _Hlk451577 _Hlk451801 _Hlk451802 _Hlk451951 _Hlk451952 _Hlk452108 _Hlk452109 _Hlk452263 _Hlk452264 _Hlk452441 _Hlk452442 _Hlk452613 _Hlk452614 _Hlk506465 _Hlk506466 _Hlk506493 _Hlk506494 _Hlk506886 _Hlk506887 _Hlk506946 _Hlk506947 _Hlk507318 _Hlk507319 _Hlk508067 _Hlk508068 _Hlk508099 _Hlk508100 _Hlk512259 _Hlk512260 _Hlk512823 _Hlk512824--ݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲݲ  !"#$%&'()*+,-./0123456789:;**PPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPP L.S.88< </@6@^^{Pjkղֲгسe9l9\\wwpt-8Pjkղֲͳٳ3333333mmnn8w8w9w9wWwWwyyyyccddPPkk̲ѲҲҲӲӲԲԲֲֲڲTUٳcmqmmnn8w8w9w9wWwWwyyyyccddPPkkѲҲҲӲӲԲԲֲֲݲQRTUٳŴŴƴƴǴǴȴȴɴɴ TUXb p$1*:r "io|e4%"=3/z@6~JL4T$j:\nRS]^{PefhwRr*_-s4;}Cip!0",##%%I'*++$6+,,I-.[.n0t2Z3"4'75L5ʲ8""9e9#:%<]<-C3C17G[GHH\(NWN UYU8WzY]]xb'Wf`Nh %k%5qUfrav&wxx*[z7{H{nDx>HQvn*q:M*LRW'hXO@R#l(%hD9L?'f#vWs2;$Mi#+b2osd[)$aj,_Y]M>vyr'0%Lu"7s\|2[S&I4>:[kPR@Lstn@|@8@@UnknownG*Cx Times New Roman5Symbol3. *Cx Arial5. .[`)Tahoma;WingdingsA$BCambria Math"9@)htt2[C[C%)P4 2q)PXR ?%L2xxc CC:\Users\dospain\AppData\Roaming\Microsoft\Templates\CSI_STYLES.dot9Electrical Systems Prefunctional Checklists and Start-UpsDOSpainFitzgerald,Richard WD         Oh+'0h    $ 0 <HPX`<Electrical Systems Prefunctional Checklists and Start-UpsDOSpainALTERATION OF THIS OFFICIAL DOCUMENT IS PROHIBITED WITHOUT EXPRESS WRITTEN PERMISSION BY OFFICE OF CAPITAL PLANNING AND MANAGEMENT AT UT MD ANDERSON CANCER CENTER. CSI_STYLESFitzgerald,Richard W3Microsoft Office Word@F#@'8@^m@߳matus CSI Division SZWXXFYDWACR-487-731%aa017405-34d9-40fb-9456-7ec1cce7e905thttp://fm/groups/cpm/TRG ?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~      !"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~      !"#$%&'()*+,-./013456789_<=>?@ANHKfLMOPQRSTUVWXYZ[\]^ghijk:Root Entry FAoJData 81Table nWordDocumentOSummaryInformation(2DocumentSummaryInformation8,PCompObjrMsoDataStore oo  !"#$%&')*+-./0123456789:;B=?@ACDEFG  F Microsoft Word 97-2003 Document MSWordDocWord.Document.89qDocumentLibraryFormDocumentLibraryFormDocumentLibraryForm ܱ="08"/> This value indicates the number of saves or revisions. The application is responsible for updating this value after each revision. cumentation> This value indicates the number of saves or revisions. The application is responsible for updating this value after each revision. "xsd:string"/> ns:ds="http://schemas.openxmlformats.org/officeDocument/2006/customXml"/>1000Microsof Filter>Document ID GeneratorDocument ID GeneratorSynchronous100011000Microsoft.Office.DocumentManagement, Version=14.0.0.0, Culture=neutral, PublicKeyToken=71e9bce111e9429cMicrosoft.Office.DocumentManagement.Internal.DocIdHandlerDocument ID GeneratorSynchronous100021001Microsoft.Office.DocumentManagement, Version=14.0.0.0, Culture=neutral, PublicKeyToken=71e9bce111e9429cMicrosoft.Office.DocumentManagement.Internal.DocIdHandlerDocument ID GeneratorSynchronous100041002Microsoft.Office.DocumentManagement, Version=14.0.0.0, Culture=neutral, PublicKeyToken=71e9bce111e9429cMicrosoft.Office.DocumentManagement.Internal.DocIdHandlerDocument ID GeneratorSynchronous100061003Microsoft.Office.DocumentManagement, Version=14.0.0.0, Culture=neutral, PublicKeyToken=71e9bce111e9429cMicrosoft.Office.DocumentManagement.Internal.DocIdHandler ՜.+,D՜.+,l px   N CAPITAL PLANNING AND MANAGEMENT UT MD ANDERSON CANCER CENTERC[ :Electrical Systems Prefunctional Checklists and Start-Ups Title X<p _dlc_DocId_dlc_DocIdItemGuid_dlc_DocIdUrl Published Date to External SiteReady to PublishSt